Fitment:
1993-1998 Toyota T100
Package includes:
1pc radiator and 4pcs clamps
Installation steps:
1. Disconnect the battery first and drain the radiator fluid into a suitable container.
2. Remove all plastic covers around the radiator and disconnect the fan's electrical connector, then loosen the bolts and remove the fan assembly.
3. Disconnect the transmission cooling line from the bottom of the radiator. Remove any clips, screws or brackets holding the heatsink in place and lift the heatsink up and out.
4. Put the new radiator in place, secure the radiator with clips or brackets, connect the transmission cooling line and connect the transmitter hose to the radiator.
5. Reconnect the fan's electrical connections and replace the plastic cover.
6. Fill the radiator with fluid when finished.
7. After the installation is complete, check again to make sure nothing is missing.
Ways to reduce Radiator failures:
1.Mainly during daily routine inspection, always check whether the radiator is leaking or rusty.
2.Clean on time.
3.Replace or add antifreeze to increase boiling point and extend service life.
Attention:
*Professional Installation is Highly Recommended.
*If you have any questions about the product, you can contact us at any time.